
All smoke ventilation units are designed and tested to
meet the requirements laid down in current codes of
practice.
Fire tests have been carried out at a leading UK Fire
Research Centre in accordance with BS 7346: Part 1
1990.
Climatic performance testing, in accordance with CP3:
chapter V: Part 2.
The smoke ventilation units meet the snow loading
requirements as laid down in BS 6399: Part 3. 1990.
Rain and wind penetration tests have been carried
out using laboratory facilities which include an outside
weathering rig, vacuum rig and aerodynamic test
chamber designed by Loughborough University
department of technology.
All resting has been carried out in accordance with BS
7346: Part 1 1990.
Automatic smoke vents open to a full 90 degrees to
allow the rapid exit of smoke and fumes. Automatic
smoke vents can be wired into the building’s
management system, or will work independently based
on temperature or air pressure.
Automatic smoke vents reduce the risk of smoke
inhalation, offer protection against extensive content
damage, and provide increased visibility for fire fighters